\subsection{Summary} \label{sec:gqa-analysis} The section's results line up into one picture of the fused kernel. Placement is decided by memory first and communication second: only the 64-way splits fit production context, and among them the both-axes sequence shard (Case~6) minimizes the per-token collective by merging softmax state rather than partial scores. Command form is decided by roofline position: the composite command removes the per-tile issue work in both regimes, but converts to wall-clock only in compute-bound prefill, while memory-bound decode stays bound by KV streaming regardless of command form. The thread connecting the two is that, once composite issue makes GEMM cheap and leaves the MAC array idle, the fused kernel's latency is set almost entirely by data movement---streaming the KV cache and reducing partials across PEs---which is exactly the cost the communication-side work (on-device reduction, lazy load/compute overlap, fast TCM staging and torus links) is built to attack. Roofline framing (\S\ref{sec:roofline}) turns this observation into a sizing and sharding programme in the next two subsections: capacity planning (\S\ref{sec:capacity-planning}) and parallelism selection (\S\ref{sec:parallelism-selection}). What this implies for hardware investment across the report as a whole is taken up in the discussion.