- §6 GQA: rewrite long-context decode from 4-case to 6-case. Data Placement Policy now presents the six placement options and their intrinsic per-PE memory / per-token comm costs (no winner predicted); the long-context subsection selects the best placement for that regime (Case 6 ★, both-axes S_kv shard) from the measured 6-case sweep. Add KV-sharding diagram + analytical budget/summary figures. - Regenerate the 6-row decode sweep (milestone-1h-gqa) and the sweep-dependent decode panels (latency/traffic/parallelism/memory) so figures, prose, and sweep_decode.json are mutually consistent. - §5 All-Reduce: add IPCQ design alternatives (architecture + decision matrix) as design-rationale schematics (illustrative step-counts, not measured) and the bench-generated topology diagram. - §4 GEMM: rename "user-orchestrated/user-level" -> "kernel-orchestrated/ kernel-level" (orchestration runs in the kernel program vs the scheduler-orchestrated composite); minor accuracy fixes (7.18 TFLOP/s ~10% below peak; ~781 ns DMA). - Recompile build/main.pdf. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
402 lines
22 KiB
TeX
402 lines
22 KiB
TeX
\section{GEMM Acceleration via the Composite Command}
|
|
\label{sec:gemm}
|
|
|
|
GEMM is the compute core of every transformer block---the QKV
|
|
projections, the attention score and context products, and the
|
|
feed-forward matrices are all matrix multiplications. On a tiled
|
|
accelerator a single logical GEMM expands into many hardware tiles, and
|
|
each tile must be read from HBM, fetched into the register file, computed,
|
|
stored, and written back. If every one of those tile-stage steps were an
|
|
independently issued command, two costs would dominate. First, the host
|
|
and the PE control processor would pay a per-command issue overhead
|
|
$O(\text{tiles}\times\text{stages})$ times, which for a deep-$K$ reduction
|
|
is hundreds to thousands of issues. Second, with stages dispatched
|
|
one-at-a-time the scheduler cannot overlap the DMA of the next tile with
|
|
the compute of the current one---the pipeline never fills, and the MAC
|
|
array sits idle waiting for data. The hardware question is therefore: what
|
|
issue mechanism lets a single GEMM saturate the MAC array without drowning
|
|
in command overhead?
|
|
|
|
\subsection{Design}
|
|
|
|
The answer is the \emph{composite command}. A single command carries
|
|
the ordered five-stage tile pipeline (\textsf{DMA\_READ},
|
|
\textsf{FETCH}, \textsf{GEMM}, \textsf{STORE}, \textsf{DMA\_WRITE}),
|
|
and the PE scheduler splits the payload into hardware tiles
|
|
(here $32\times64\times32$), emitting one tile token per tile.
|
|
Subsequent stages are reached by \emph{token self-routing} between
|
|
the on-PE engines, so a tile flows through the chain without
|
|
returning to the scheduler between stages. Because the whole
|
|
pipeline is described by one command, the issue cost is paid once
|
|
per GEMM rather than once per tile-stage, and the scheduler is free
|
|
to keep every stage busy on different tiles simultaneously---tile
|
|
$i$'s GEMM overlaps tile $i{+}1$'s DMA read. A multi-operation composite
|
|
additionally lets an epilogue (for example a vector-math step) ride the
|
|
same tile loop, firing per $K$-tile, per output tile, or once per kernel
|
|
according to its declared scope; this is what later allows an attention
|
|
kernel to fuse its softmax work into the GEMM pipeline
|
|
(\S\ref{sec:gqa}).
|
|
|
|
\subsection{Results}
|
|
|
|
We sweep eight GEMM shapes spanning square, tall, wide, and deep-$K$
|
|
geometries under two operand-staging variants that bracket the
|
|
realistic LLM cases. In \textsf{load\_ref}, the activation $A$ is
|
|
pre-staged on chip and only the weight $W$ streams from HBM during
|
|
the composite (the ``activation in TCM, weights from HBM'' case
|
|
typical of decoding with a small batch). In \textsf{ref\_ref}, both
|
|
operands stream from HBM during the composite (the ``cold both
|
|
sides'' case, where the activation does not fit on-chip or is itself
|
|
the output of a producer composite that wrote back to HBM). Both
|
|
variants run the same composite command; only the up-front staging
|
|
of $A$ differs.
|
|
|
|
We evaluate the composite GEMM along two axes that together describe
|
|
how well it lands on the hardware: \emph{HBM bandwidth utilization}
|
|
(does the workload saturate the per-PE HBM bandwidth, i.e.\ is it
|
|
memory-bound on this configuration?) and \emph{achieved GEMM
|
|
throughput} (what fraction of the \SI{8}{\tera\flop\per\second}
|
|
per-PE peak does the kernel actually deliver). Both metrics use the
|
|
composite window as the denominator, so the up-front \textsf{tl.load}
|
|
of $A$ in \textsf{load\_ref} is excluded — only HBM traffic and
|
|
compute that happen \emph{inside} the composite count.
|
|
|
|
\begin{figure}[t]
|
|
\centering
|
|
\includegraphics[width=\linewidth]{gemm_hbm_bw_util.png}
|
|
\caption{Per-PE HBM bandwidth utilization during the composite window,
|
|
for the two staging variants. The ceiling is the per-PE HBM bandwidth
|
|
(\SI{256}{\giga\byte\per\second}; dashed line at \SI{100}{\percent}).
|
|
\textsf{ref\_ref} streams both $A$ and $W$ and so always sits at a
|
|
higher BW-utilization than \textsf{load\_ref} on the same shape;
|
|
both variants saturate ($>\SI{85}{\percent}$) once the kernel
|
|
has enough total bytes to keep the link busy (deep-$K$ $K{=}3072$,
|
|
or low-reuse output-dominated $M{=}128,K{=}8,N{=}128$). Small or
|
|
single-tile shapes do not have enough total traffic to saturate the
|
|
link and are bottlenecked by pipeline fill rather than HBM.}
|
|
\label{fig:gemm-bw}
|
|
\end{figure}
|
|
|
|
\begin{figure}[t]
|
|
\centering
|
|
\includegraphics[width=\linewidth]{gemm_per_pe_tflops.png}
|
|
\caption{Per-PE GEMM throughput delivered during the composite window
|
|
(reference line at the \SI{8}{\tera\flop\per\second} per-PE engine
|
|
peak). At the deep-$K$ corner $M{=}32,K{=}3072,N{=}32$ the
|
|
activation-pre-staged kernel reaches
|
|
\SI{7.18}{\tera\flop\per\second} ($\sim\SI{90}{\percent}$ of peak);
|
|
the both-from-HBM variant drops to
|
|
\SI{3.83}{\tera\flop\per\second} ($\sim\SI{48}{\percent}$) at the
|
|
same shape because the second operand doubles HBM pressure and the
|
|
kernel hits the BW ceiling shown in Fig.~\ref{fig:gemm-bw}.
|
|
Under-tile shapes ($M{=}K{=}N{=}32$, $M{=}8$, $K{=}8$) are
|
|
hard-capped by tile-fill at \SI{50}{\percent}, \SI{25}{\percent},
|
|
\SI{12.5}{\percent} of peak regardless of staging.}
|
|
\label{fig:gemm-tflops}
|
|
\end{figure}
|
|
|
|
The composite reaches the hardware roofline in two distinct regimes.
|
|
\emph{Memory-bound}: $K{=}3072$ deep-$K$ saturates HBM (\SI{88}{\percent}
|
|
load\_ref, \SI{94}{\percent} ref\_ref) and the low-reuse
|
|
$M{=}128,K{=}8,N{=}128$ corner saturates even harder
|
|
($>\SI{96}{\percent}$ in both), because back-to-back output
|
|
writes dominate. \emph{Compute-rich}: at the same deep-$K$ shape,
|
|
\textsf{load\_ref} delivers \SI{7.18}{\tera\flop\per\second}
|
|
($\sim\SI{90}{\percent}$ of the per-PE peak) — the configuration's
|
|
clean win. The \emph{distance between the two variants} at the same
|
|
shape is the cost of \emph{not} pre-staging $A$: at $K{=}3072$ the
|
|
throughput halves (\SI{7.18}{\tera\flop\per\second} $\to$
|
|
\SI{3.83}{\tera\flop\per\second}) because the second operand doubles
|
|
HBM pressure
|
|
and the kernel hits the BW ceiling. This is the operational
|
|
take-away — when the activation can live on-chip the composite
|
|
delivers near-peak GEMM; when it cannot the BW ceiling dominates and
|
|
throughput halves.
|
|
|
|
Figure~\ref{fig:gemm-util} validates that simulator-measured
|
|
efficiency tracks an analytic ideal-pipeline model (within
|
|
\SI{1.4}{ppt} across every swept shape), and
|
|
Figure~\ref{fig:gemm-stages} resolves the per-stage engine wall-clock
|
|
that backs the above interpretation.
|
|
|
|
\begin{figure}[t]
|
|
\centering
|
|
\includegraphics[width=\linewidth]{gemm_mac_utilization_theoretical_vs_measured.png}
|
|
\caption{GEMM MAC utilization and efficiency, theoretical vs.\ measured
|
|
(\textsf{load\_ref} staging). Tile-fill sets the ceiling: under-tile
|
|
shapes (marked $\ast$) such as $M{=}K{=}N{=}32$, $M{=}8$, and $K{=}8$
|
|
cannot fill the MAC tile and cap at \SI{50}{\percent},
|
|
\SI{25}{\percent}, \SI{12.5}{\percent}. For tile-filling shapes,
|
|
efficiency climbs with tile count---from
|
|
\textasciitilde\SI{15}{\percent} at one tile to \textasciitilde%
|
|
\SI{90}{\percent} measured at 48 tiles ($K{=}3072$)---and the
|
|
measured bars track the analytic ideal-pipeline prediction within
|
|
\SI{1.4}{ppt} across every shape.}
|
|
\label{fig:gemm-util}
|
|
\end{figure}
|
|
|
|
\begin{figure}[t]
|
|
\centering
|
|
\includegraphics[width=\linewidth]{gemm_stage_breakdown.png}
|
|
\caption{Per-stage engine wall-clock (DMA in, Fetch, GEMM, DMA out)
|
|
under \textsf{load\_ref} staging. For the deep-$K$ shape ($K{=}3072$,
|
|
48 tiles) DMA in, Fetch, and GEMM are all close to
|
|
\textasciitilde\SI{785}{\nano\second}, running concurrently in a
|
|
tightly pipelined regime while DMA-out is negligible. For the
|
|
low-reuse shape ($M{=}128,K{=}8,N{=}128$, 16 output tiles) DMA-out
|
|
grows to \textasciitilde\SI{336}{\nano\second} while GEMM compute is
|
|
\textasciitilde\SI{262}{\nano\second}---a data-movement-bound regime
|
|
where the output write becomes the largest stage.}
|
|
\label{fig:gemm-stages}
|
|
\end{figure}
|
|
|
|
\subsection{Analysis and meaning}
|
|
|
|
The composite command does not manufacture bandwidth or MAC
|
|
throughput; it removes the two software-shaped obstacles between a
|
|
GEMM and its hardware roofline. By paying the issue cost once per
|
|
GEMM rather than once per tile-stage, and by chaining tile-stages
|
|
through token self-routing, it lets the scheduler keep every stage
|
|
busy on a different tile, so compute-rich shapes actually reach the
|
|
efficiency their arithmetic intensity allows
|
|
($\sim$\SI{90}{\percent} of GEMM peak at the deep-$K$
|
|
\textsf{load\_ref} corner) and data-bound shapes actually reach
|
|
their HBM-BW ceiling instead of stalling on command overhead.
|
|
|
|
The split between \textsf{load\_ref} and \textsf{ref\_ref} also makes
|
|
the hardware-software boundary explicit: when the activation fits in
|
|
on-chip storage the composite is BW-headroom-rich and saturates the
|
|
GEMM engine; when it does not, both operands compete for the same
|
|
HBM port and the kernel is BW-bound. This is the lever the GQA
|
|
kernel of \S\ref{sec:gqa} reaches for next — keeping the right
|
|
working set on-chip so the composite pipeline lands in the
|
|
compute-rich regime rather than the BW-bound one.
|
|
|
|
\subsection{Why composite, and not kernel-orchestrated async loading?}
|
|
\label{sec:gemm-vs-async}
|
|
|
|
A reader familiar with double-buffered GEMM kernels on conventional
|
|
hardware may ask: why a hardware-side composite command at all? Why
|
|
isn't the obvious kernel-level pattern --- async-load each operand,
|
|
overlap with compute, accumulate --- sufficient?
|
|
|
|
To answer this concretely we contrast composite against two
|
|
kernel-orchestrated baselines that have access to the same single-op
|
|
primitives the platform exposes (\textsf{tl.load} for async DMA into
|
|
TCM, \textsf{tl.dot} for a single-op GEMM command on TCM-resident
|
|
operands, \textsf{tl.store} for a DMA write-back). Both baselines
|
|
pre-stage activation $A$ identically to \textsf{load\_ref}, so the
|
|
window measured is the engine-pipeline window with $A$'s up-front DMA
|
|
excluded for all three kernels.
|
|
|
|
\paragraph{Async-full (naive).} A single \textsf{tl.load(A)} followed by
|
|
a single \textsf{tl.load(B)} (async, queued behind $A$),
|
|
\textsf{tl.dot(A, B)}, and \textsf{tl.store(out)}. The kernel issues
|
|
four commands total. The decisive constraint is that
|
|
\textsf{tl.dot}'s \textsf{\_await\_pending(b)} blocks the GEMM
|
|
command until the \emph{entire} $B$ has landed in TCM --- there is no
|
|
way at the runtime API surface to express ``start computing on
|
|
tile 0 of $B$ while tile 1 is still in flight.'' Load-of-$B$ and
|
|
GEMM therefore serialize.
|
|
|
|
\paragraph{Async-tiled (chunked prefetch).} The kernel-level workaround is to
|
|
split $B$ along $K$ into \textsf{TILE\_K}-sized chunks, issue async
|
|
\textsf{tl.load}s for those chunks, issue one \textsf{tl.dot} per
|
|
chunk (each blocking only on its own $b_i$), and accumulate via
|
|
\textsf{out = out + tl.dot(...)}. This is the standard
|
|
double-buffered-GEMM pattern transcribed to the single-op primitives.
|
|
We measure two versions of this kernel that differ only in
|
|
\emph{prefetch depth}:
|
|
\textbf{depth-2 (TCM-bounded)} keeps at most two B-chunks in flight
|
|
at any time by issuing the next \textsf{tl.load} just before each
|
|
\textsf{tl.dot}; \textbf{depth-$\infty$ (queue-all)} issues all $N_K$
|
|
B-chunk loads up front so the DMA engine has the deepest possible
|
|
request queue. For a $K{=}3072$ shape both versions emit
|
|
48 $A$-chunk loads + 48 $B$-chunk loads + 48 \textsf{tl.dot}s + 47
|
|
elementwise adds + 1 store = 192 host-side commands; the only
|
|
difference is the temporal interleaving of B-load and dot dispatches.
|
|
|
|
\paragraph{Why two depths.} The depth distinction matters because the
|
|
async-full kernel and the depth-$\infty$ async-tiled kernel both pin the
|
|
\emph{entire} $B$ in TCM simultaneously --- $K \cdot N \cdot 2$
|
|
bytes. The on-PE scratch is capped at \SI{1}{\mebi\byte}
|
|
(\texttt{topology.yaml: pe\_tcm.kernel\_scratch\_mb=1}), so an LLM-scale
|
|
attention $B = K_{\text{KV}} \times d_{\text{head}}$ at
|
|
$K_{\text{KV}}=4096, d_{\text{head}}=128$ already needs
|
|
\SI{1}{\mebi\byte}, and at $K_{\text{KV}}=8192$ it needs \SI{2}{\mebi\byte}
|
|
--- past the cap. async-full and queue-all async-tiled are therefore
|
|
not just slower than composite but \emph{architecturally infeasible}
|
|
at LLM context length. The depth-2 async-tiled kernel is the only
|
|
kernel-level
|
|
variant whose peak TCM footprint stays
|
|
$O(2 \cdot \textsf{TILE\_K} \cdot N)$ regardless of $K$, the same
|
|
order as composite's per-tile streaming buffer. It is the apples-to-apples
|
|
comparison.
|
|
|
|
\paragraph{Per-PE throughput.} Figure~\ref{fig:gemm-async} reports
|
|
per-PE TFLOP/s for all four kernels side-by-side. The single-op
|
|
fast-path in the dispatch cost model (\S\ref{sec:congestion}) is
|
|
enabled, so every single-op command the async kernels emit --- DMA
|
|
descriptors and \textsf{tl.dot}/\textsf{tl.add} alike --- is charged the
|
|
light 8-cycle \textsf{FIXED}, not the 40-cycle composite control-path
|
|
cost; neither async-tiled variant carries an inflated per-command cost.
|
|
|
|
\paragraph{The $K{=}3072$ corner, concretely.} We take this shape
|
|
($M{=}32, K{=}3072, N{=}32$) as the running example throughout the
|
|
mechanism discussion because it is the regime where the four
|
|
kernels spread the widest --- the deepest $K$ in the sweep maps
|
|
onto $K / \textsf{TILE\_K} = 48$ hardware tiles, so per-tile costs
|
|
amplify into the largest measurable gap. The work content is
|
|
identical for all four kernels: $\sim$6.3 M f16 MACs and
|
|
$\sim$386 KiB of $B$ traffic from HBM, which together require
|
|
$\sim$786 ns of GEMM-engine compute and $\sim$781 ns of DMA on a
|
|
saturated per-PE link. What differs is the number of host commands
|
|
the same work is decomposed into --- 2 for composite (one
|
|
\textsf{tl.load(A)} plus one composite), 4 for async-full, and 192
|
|
for either async-tiled variant (48 $A$-loads + 48 $B$-loads + 48
|
|
\textsf{tl.dot}s + 47 elementwise adds + 1 store). The
|
|
engine-pipeline-window throughput tracks that decomposition closely:
|
|
composite reaches \SI{7.18}{\tera\flop\per\second} (post-overlap
|
|
limit, only \SI{10}{\percent} below the \SI{8}{\tera\flop\per\second}
|
|
per-PE GEMM peak), async-full \SI{3.91}{\tera\flop\per\second}
|
|
(DMA and compute serialize on a single big dot), and both async-tiled
|
|
variants $\sim$\SI{2.53}{\tera\flop\per\second} (192 commands' worth of
|
|
structural dispatch cost --- even at the light per-command rate ---
|
|
accumulates on the wall). The next paragraph attributes those gaps to
|
|
specific simulator mechanisms.
|
|
|
|
\begin{figure*}[t]
|
|
\centering
|
|
\includegraphics[width=\linewidth]{gemm_composite_vs_async_tflops.png}
|
|
\caption{Per-PE achieved TFLOP/s for the same shape sweep run under
|
|
four issuance patterns: composite (one command, scheduler streams
|
|
per-tile internally), async-full (one \textsf{tl.dot} on
|
|
fully-loaded $B$), async-tiled with depth-2 double-buffer
|
|
(TCM-bounded; the only kernel-level variant that scales to LLM
|
|
context length), and async-tiled with depth-$\infty$
|
|
(all B-tiles queued up front; included as a sanity check that the
|
|
prefetch depth is \emph{not} what separates the async-tiled kernel from
|
|
composite). All curves exclude $A$'s up-front DMA from the
|
|
measurement window. Composite wins at every full-tile shape; the
|
|
depth-2 and depth-$\infty$ async-tiled kernels deliver
|
|
\emph{indistinguishable} throughput (e.g. \SI{2.522}{} vs.\
|
|
\SI{2.544}{\tera\flop\per\second} at $K{=}3072$), confirming that
|
|
prefetch depth is not the lever --- the structural per-command
|
|
dispatch cost is. The gap between composite and the async-tiled
|
|
kernels grows with $K_{\text{useful}}$
|
|
(\textbf{$\sim$$2.8\times$} at $K{=}3072$, where the async-tiled
|
|
kernels emit 192 host commands while composite emits one).
|
|
The under-tile corner $M{=}128,K{=}8,N{=}128$ inverts: composite's
|
|
per-tile orchestration overhead exceeds the per-tile useful work,
|
|
and all three async kernels beat it.}
|
|
\label{fig:gemm-async}
|
|
\end{figure*}
|
|
|
|
\paragraph{Decomposing the gap.} Three structural mechanisms separate
|
|
composite from the kernel-level baselines, and they layer.
|
|
|
|
\emph{1. Inter-engine token routing happens below the host-side
|
|
dispatch path.} The composite encodes the full
|
|
\textsf{DMA\_READ}$\to$\textsf{FETCH}$\to$\textsf{GEMM}$\to$\textsf{STORE}$\to$\textsf{DMA\_WRITE}
|
|
pipeline once. The scheduler's tile-feeder loop then emits one
|
|
\emph{tile token} per HW tile inside that one composite, and each
|
|
token self-routes between engines after each stage finishes. The
|
|
per-tile token routing is a scheduler-internal event, not a fresh
|
|
host command, so it does not pay the structural CPU dispatch cost.
|
|
At $K{=}3072$ the composite emits 48 tile tokens that flow
|
|
fully-pipelined through five stages each --- 240 inter-engine
|
|
hand-offs total --- behind a single command from the host's point of
|
|
view.
|
|
|
|
\emph{2. \textsf{tl.dot} cannot replicate that per-tile pipeline at the
|
|
kernel level.} A single-op GEMM command is handled on the GEMM engine as
|
|
a single monolithic compute timeout for the supplied $M{\times}K{\times}N$;
|
|
there is no internal token loop that would let a streaming DMA of
|
|
$B[i{+}1]$ overlap with the GEMM of $B[i]$ inside one
|
|
\textsf{tl.dot}. The user can only recover inter-tile overlap by
|
|
emitting one \textsf{tl.dot} per chunk --- which is exactly what the
|
|
async-tiled baseline does, at the price of $N$ host-side commands.
|
|
|
|
\emph{3. The host-side dispatch cost the async-tiled baseline pays is
|
|
structural, not modelling slack.} KernBench charges every host-emitted
|
|
command a structural CPU dispatch cost $d_{\text{cmd}} = \textsf{FIXED} +
|
|
b_{\text{logical}} \cdot R$ (\S\ref{sec:congestion}). The cost model is
|
|
deliberately charitable to the async kernels here: only a
|
|
\textsf{CompositeCmd} pays the 40-cycle control-path \textsf{FIXED} (it
|
|
alone drives a scheduler-built tile-feeder plan), while \emph{every}
|
|
single-op command --- the 96 DMA descriptors, the 48 \textsf{tl.dot}s,
|
|
and the 47 elementwise adds alike --- pays only the light 8-cycle
|
|
\textsf{FIXED}, calibrated to descriptor-ring-push / single-instruction
|
|
issue patterns in modern accelerators (NVIDIA Hopper TMA $\sim$1 ISA
|
|
cycle, a single \textsf{mma.sync} one instruction, AMD AQL packet writes
|
|
$\sim$5--15 cycles). So the async-tiled baseline is \emph{not} penalized
|
|
by an inflated per-command cost on \emph{any} of its operations. Yet it
|
|
still emits 192 host commands against composite's one, so $\sim$192
|
|
light dispatches accumulate to $\sim$\SI{1.5}{\micro\second} of
|
|
structural PE\_CPU time that composite never pays --- composite hides
|
|
its 48 tiles' 240 inter-engine hand-offs as scheduler-internal events
|
|
(mechanism 1). Layered on top, the dependency chain on the running
|
|
accumulator serializes the 47 adds on the math engine. The net result
|
|
is that the async-tiled kernel runs $\sim$2.8$\times$ slower than
|
|
composite at $K{=}3072$ despite getting the inter-chunk overlap right
|
|
--- down from $\sim$6.3$\times$ under the earlier uniform-40 cost model,
|
|
because D8 removed the per-command overcharge, but \emph{not} closed:
|
|
the residual gap is the command-count structure (one composite vs.\ 192
|
|
single-ops), not a modelling artifact.
|
|
|
|
\emph{4. Prefetch depth is not the lever, command count is.} The
|
|
depth-2 and depth-$\infty$ async-tiled kernels land within \SI{1}{\percent}
|
|
of each other at every measured shape (Figure~\ref{fig:gemm-async}).
|
|
This is the diagnostic against a natural objection: ``surely the
|
|
async-tiled kernel was just under-prefetching; deepen the queue and the
|
|
DMA$\to$GEMM overlap recovers.'' Deepening the prefetch queue
|
|
changes \emph{when} DMA descriptors hit the engine but not their
|
|
total number or the structural dispatch cost they each pay. The
|
|
$\sim$2.8$\times$ gap to composite is not a prefetch-depth gap; it
|
|
is the gap between
|
|
``one composite command with internal per-tile token routing'' and
|
|
``$N_K$ host-side dot/add commands, each charged separately.''
|
|
The depth-2 kernel additionally constrains peak TCM occupancy to
|
|
$O(2 \cdot \textsf{TILE\_K} \cdot N)$, matching composite's per-tile
|
|
streaming buffer; the depth-$\infty$ kernel needs the full $B$ in
|
|
TCM, which makes it infeasible at LLM context length even if the
|
|
throughput were competitive.
|
|
|
|
\paragraph{Where the composite advantage doesn't apply.} The shape
|
|
$M{=}128,K{=}8,N{=}128$ inverts the picture: composite delivers
|
|
\SI{0.66}{\tera\flop\per\second} and both async kernels reach
|
|
\SI{1.21}{\tera\flop\per\second}. The reason is consistent with the
|
|
analysis above and explicit in the simulator state. Composite emits
|
|
16 tile tokens (one per output tile) for this shape, each carrying
|
|
$K_{\text{useful}}{=}8$ MACs across a TILE\_K$=64$ pipeline ---
|
|
$12.5\%$ of the hardware tile's MAC slots are useful, the rest is
|
|
K-padding. The per-tile inter-engine hand-off cost stays the same
|
|
regardless. When the per-tile useful work is small enough that
|
|
hand-off overhead exceeds the GEMM work itself, a single-op
|
|
\textsf{tl.dot} --- which submits one monolithic GEMM command with no
|
|
per-tile orchestration --- wins. The take-away is the bound on
|
|
composite's value: it amortizes useful per-tile compute, not
|
|
padding-dominated under-tile shapes. Real kernels at this corner are
|
|
better served by reshape-into-batched-GEMM transforms that move
|
|
under-tile $K$ into a tile-filling dimension before reaching the GEMM
|
|
engine, which is exactly what the GQA decode kernel of
|
|
\S\ref{sec:gqa} does for its $K_{\text{useful}}=\text{head\_dim}=128$
|
|
inner reduction.
|
|
|
|
\paragraph{Summary of the comparison.} Composite is the only one of
|
|
the four kernels to combine (a) macro-command dispatch at the host
|
|
boundary (amortizing the structural CPU cost across all the work a
|
|
single GEMM does), (b) scheduler-internal per-HW-tile streaming of
|
|
DMA$\rightleftarrows$compute, and (c) TCM-bounded streaming buffer.
|
|
Kernel-orchestrated async kernels can have any two of those, not all
|
|
three: async-full pays one host dispatch (a) but forfeits per-tile
|
|
overlap (b) and pins all of $B$ in TCM (c); depth-$\infty$ async-tiled
|
|
achieves inter-chunk overlap but at $N_K$ host dispatches and
|
|
full-$B$ TCM occupancy; depth-2 async-tiled fixes the TCM
|
|
footprint (c) but still pays $N_K$ host dispatches. The two corners
|
|
where async catches up
|
|
(small-$K$ where composite has nothing useful to amortize;
|
|
under-tile shapes where per-tile useful work is sub-token) are
|
|
diagnostic of \emph{where composite is the wrong tool}, not of a
|
|
slack the user kernel could close.
|